To demand or not to demand adherence to contractor 's written proposal
Have hired a landscape contractor to install a patio, a walkway and a
6"-strip of gravel along the walkway, next to our boundary fence. The landscaper and landscaper's crew while appearing to be competent failed to adhere to the diagram outlined or to the timetable they themselves set. While I understand that things, like the concrete truck breaking down, happen, making it impossible to keep a tight adherence to the schedule, I find it incomprehensible that the landscaper failed to refer to the detailed diagram I've sent him. The project is nearly done, and they've just done the walkway. However, they failed to install the gravel along the walkway. Whould I hold the landscaper to it? (We're talking about 50 or 60 sq. ft. of gravel.) BTW, I have not paid the landscaper a dime other than the deposit required to do the work. Thanks in advance for your input. Lil |
#2
|
|||
|
|||
To demand or not to demand adherence to contractor 's written proposal
|
#4
|
|||
|
|||
To demand or not to demand adherence to contractor 's written proposal
Speaking as a contractor, I think a frank yet professional conversation
would be best. Simply tell him words to the effect, "The plan we agreed upon and the diagram I showed you has insert missing features. When are you planning on installing them?" Dave "Lil" wrote in message om... Have hired a landscape contractor to install a patio, a walkway and a 6"-strip of gravel along the walkway, next to our boundary fence. The landscaper and landscaper's crew while appearing to be competent failed to adhere to the diagram outlined or to the timetable they themselves set. While I understand that things, like the concrete truck breaking down, happen, making it impossible to keep a tight adherence to the schedule, I find it incomprehensible that the landscaper failed to refer to the detailed diagram I've sent him. The project is nearly done, and they've just done the walkway. However, they failed to install the gravel along the walkway. Whould I hold the landscaper to it? (We're talking about 50 or 60 sq. ft. of gravel.) BTW, I have not paid the landscaper a dime other than the deposit required to do the work. Thanks in advance for your input. Lil |
#5
|
|||
|
|||
To demand or not to demand adherence to contractor 's written proposal
wrote in message . ..
On 3 Jul 2003 22:24:58 -0700, (Lil) wrote: Have hired a landscape contractor to install a patio, a walkway and a 6"-strip of gravel along the walkway, next to our boundary fence. The landscaper and landscaper's crew while appearing to be competent failed to adhere to the diagram outlined or to the timetable they themselves set. While I understand that things, like the concrete truck breaking down, happen, making it impossible to keep a tight adherence to the schedule, I find it incomprehensible that the landscaper failed to refer to the detailed diagram I've sent him. The project is nearly done, and they've just done the walkway. However, they failed to install the gravel along the walkway. Whould I hold the landscaper to it? (We're talking about 50 or 60 sq. ft. of gravel.) BTW, I have not paid the landscaper a dime other than the deposit required to do the work. Thanks in advance for your input. 1. Did you have a written contract? 2. What did it specify? 3. If 1 and 2 are true, what penalties or sanctions were written into the contract for failure to follow its provisions? 4. You say you "sent" the contractor a diagram. Does that mean you are not on the premises? Are you too far away to supervise in person? If so, did you delegate someone to supervise i person? 5. In what other respects did he "fail to adhere to the diagram" -- other than not installing the gravel? 6. Why would you NOT require him to install the gravel? 7. "The project is nearly done, and they've just done the walkway." How can it be "nearly done" if the patio has not been installed. These are some of the questions that immediately occur to one. You might also want to post on misc.legal and/or misc.legal.moderated but I suggest you clarify your presentation to get their best advice. Note that the Moderated group posts messages only every few days, while the other does daily. HTH Yes, there is a written contract. The patio is done, and the walkway is done, with the exception of the 6" strip of gravel. The problem is the written quote did not include specific dimensions, or materials. To protect myself, I included the specification of the materials in the written contract, and in the acceptance of the original written estimate, I referred to a diagram that I had drawn up. Another problem was as the project progressed, there were changes to the original diagram, which I documented by modifying the diagram I had drawn up and faxing it to him. The first ones were my modification where I lengthened the walkway by 40 sq. ft., and had him border the walkway with pavers. We discussed and I documented our conversation by faxing him a letter and a revised diagram. The second major modification was when his crew paved over the 40 sq. ft. walkway rather than pouring concrete. Because I had documented that he agreed that it would be at no additional cost. (My answering machine might have taped that entire conversation. It was early in the morning and I didn't have time to go downstairs and turn off the answering machine.) I remember asking his crew about the gravel on the day they did the walkway. When I came back home (I had an appointment), they had left. That's when I discovered that his crew goofed again, like paving part of the walkway. I'm not sure if he ever came by to inspect on the last day when the crew poured the concrete. I was thinking of faxing him a letter informing him of this omission, as someone below suggests. Would that be the best course? Thanks in advance. Lil |
#6
|
|||
|
|||
To demand or not to demand adherence to contractor 's written proposal
"Lil" wrote in message om... Have hired a landscape contractor to install a patio, a walkway and a 6"-strip of gravel along the walkway, next to our boundary fence. The landscaper and landscaper's crew while appearing to be competent failed to adhere to the diagram outlined or to the timetable they themselves set. While I understand that things, like the concrete truck breaking down, happen, making it impossible to keep a tight adherence to the schedule, I find it incomprehensible that the landscaper failed to refer to the detailed diagram I've sent him. The project is nearly done, and they've just done the walkway. However, they failed to install the gravel along the walkway. Whould I hold the landscaper to it? (We're talking about 50 or 60 sq. ft. of gravel.) BTW, I have not paid the landscaper a dime other than the deposit required to do the work. Thanks in advance for your input. Lil If I understand the desciption of your project correctly, the gravel borders the walkway, right? If it were me, my order of doing things would also leave the installation of the gravel as the last project because walking to and fro while installing the walkway would be a lot more difficult through the gravel than it would through the dirt. Also, if they had to wheelbarrow the concrete in there instead of using a pump (if the chute of the concrete truck couldn't reach the whole thing) then it'd be a nightmare to wheelbarrow heavy loads of concrete through gravel rather than over the compacted earth. And, when the path was completed, the concrete needs time to cure, typically 7 days at least (30 days is better) where it is kept covered and moist. After than 7 days is when I'd expect to install the gravel portion of the project. Have you communicated with the conctractor at all regarding the *order* that the project is being completed in? You mentioned unavoidable delays, and it does seem the contractor has at least been talking with you about them, but perhaps you haven't been fully communicating your expectations to him, or he misunderstood what you did communicate. At any rate, if he has not approached you about payment, then I'm sure he doesn't consider the job complete yet either! Sunflower MS 7b |
#7
|
|||
|
|||
To demand or not to demand adherence to contractor 's written proposal
The concrete should take 7 days to "cure" properly? And it's supposed
to cover it? Our concrete walkway was left uncovered and allowed to dry overnight.... The one thing I noticed was that communication was a HUGE issue with the project. The contractor did not communicate with me at all. Several times, if the crew wasn't here by 11 a.m., the odds were they weren't going to show up at all. Then when I called, it would be--the tiles haven't come, etc. Well, it's almost over. Just a few more days until the final walkthrough.... Lil "Sunflower" wrote in message ... "Lil" wrote in message om... Have hired a landscape contractor to install a patio, a walkway and a 6"-strip of gravel along the walkway, next to our boundary fence. The landscaper and landscaper's crew while appearing to be competent failed to adhere to the diagram outlined or to the timetable they themselves set. While I understand that things, like the concrete truck breaking down, happen, making it impossible to keep a tight adherence to the schedule, I find it incomprehensible that the landscaper failed to refer to the detailed diagram I've sent him. The project is nearly done, and they've just done the walkway. However, they failed to install the gravel along the walkway. Whould I hold the landscaper to it? (We're talking about 50 or 60 sq. ft. of gravel.) BTW, I have not paid the landscaper a dime other than the deposit required to do the work. Thanks in advance for your input. Lil If I understand the desciption of your project correctly, the gravel borders the walkway, right? If it were me, my order of doing things would also leave the installation of the gravel as the last project because walking to and fro while installing the walkway would be a lot more difficult through the gravel than it would through the dirt. Also, if they had to wheelbarrow the concrete in there instead of using a pump (if the chute of the concrete truck couldn't reach the whole thing) then it'd be a nightmare to wheelbarrow heavy loads of concrete through gravel rather than over the compacted earth. And, when the path was completed, the concrete needs time to cure, typically 7 days at least (30 days is better) where it is kept covered and moist. After than 7 days is when I'd expect to install the gravel portion of the project. Have you communicated with the conctractor at all regarding the *order* that the project is being completed in? You mentioned unavoidable delays, and it does seem the contractor has at least been talking with you about them, but perhaps you haven't been fully communicating your expectations to him, or he misunderstood what you did communicate. At any rate, if he has not approached you about payment, then I'm sure he doesn't consider the job complete yet either! Sunflower MS 7b |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
she'd sit somehow than contrast with Rifaat's written decline | Ponds | |||
The Ancient Art of Bonsai (eBook edition)- Written by Japanese Bonsai Master Kimura | Bonsai | |||
OT - Online sharing of self written texts? | Gardening | |||
OT - Online sharing of self written texts? | United Kingdom |